[1]
Shi, G., Tong, J., Chen, Z. and Wang, Y. 2025. Optimal time-based and cost-based contracts in construction projects under asymmetric information. Journal of Civil Engineering and Management. 31, 4 (Mar. 2025), 299–317. DOI:https://doi.org/10.3846/jcem.2025.23318.