Vol 28 No 5 (2022)
Published: 2022-05-03
Articles
Balanced approach for tendering practice at the pre-contract stage: the UK practitioner’s perspective
Abstract 3278 | PDF Downloads 1215 | DOI https://doi.org/10.3846/jcem.2022.16580
Page 338–348
Cybersecurity assessment of BIM/CDE design environment using cyber assessment framework
Abstract 3402 | PDF Downloads 1639 | DOI https://doi.org/10.3846/jcem.2022.16682
Page 349–364
Causes and effects of poor communication in the construction industry in the MENA region
Abstract 7268 | PDF Downloads 3823 | DOI https://doi.org/10.3846/jcem.2022.16728
Page 365–376
An evidence-based risk decision support approach for metro tunnel construction
Abstract 2234 | PDF Downloads 658 | DOI https://doi.org/10.3846/jcem.2022.16807
Page 377–396
Study on seismic response of a new staggered story isolated structure considering SSI effect
Abstract 2116 | PDF Downloads 584 | DOI https://doi.org/10.3846/jcem.2022.16825
Page 397–407
Machine learning for text classification in building management systems
Abstract 2183 | PDF Downloads 1022 | DOI https://doi.org/10.3846/jcem.2022.16012
Page 408–421